Gate ME-2005 Question Paper With Solutions

Q 71. A welding operation is time-studied during which an operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are allowed for this operation, the expected standard production rate of the weld-joint (in units per 8 hour day) is

(A) 45

(B) 50

(C) 55

(D) 60

Answer: (A)

Explanation: