Gate ME 2014-4 Question Paper With Solutions

Q. 61 At a work station, 5 jobs arrive every minute. The mean time spent on each job
in the work station is 1/8 minute. The mean steady state number of jobs in the
system is _____

Answer: (1.6666)

Explanation: