Backup impedance Protection Working Principle (21G)

Backup impedance Protection Working Principle (21G) The Backup Impedance Protection is used to protect the generator from supplying the over loaded or faulty system and it is a definite time graded protection, for a short circuit phase fault in Generator, Generator Transformer, Bus duct or as back up of uncleaned external network fault. It is backup … Continue reading Backup impedance Protection Working Principle (21G)